Greenfield Projects



GM Pharmaceuticals, Tbilisi, Georgia. Tablet capsule project.

This was a tablet capsule project. The scope of work involved complete designing and implementation of the project including layout and detailed engineering for the production and HVAC system. Complete supply of production machinery and the HVAC system and the installation and commissioning of the same were also part of the assignment with PARSAN. .


Soprodim SA Algeria. Tablet capsule project.

This was a tablet capsule project. The scope of work included complete consultancy and supply of all equipment on a turnkey basis. The layout and all detailed engineering work was done by us including submission of all working drawings. We were also involved in site supervision of the project including supervision for the HVAC work.


Jurabek Laboratories,Uzbekistan. Pharmaceutical project.

This was a pharmaceutical project. We were involved in the complete project preparation including discussions with the local banks and technical institutes for clearance of the project. Complete consultancy including layout preparation, detailed engineering, commissioning of the equipments and the HVAC system was provided by PARSAN.


Actoverco, Solid Dosage Facility, Iran. Tablet capsule project.

This was a tablet capsule project. Our involvement included complete designing including layouts, detailed engineering, drawing up the equipment list and balancing of the same. All working drawings were provided. We also closely interacted with the local architects. Our team supervised the site including the HVAC work. We have also provided trained manpower for the running of the project.


Actoverco Phase I, Iran. Biotech project

This is a biotech project which was implemented in two phases. Project has lyophilized products and prefilled syringe lines. Scope of work includes acting as PMC for the project, liaison with the technical collaborators of the project from Argentina, supply & Installation of Machinery, Water system, HVAC system and site supervision.


Actoverco, Iran. Ampoule Project.

This is a sterile unit which has already being implemented. Project has Ampoule production line. Scope of work includes acting as PMC for the project, liaison with the technical collaborators of the project from Merck, Germany. Scope includes acting as PMC for the project, supply & Installation of Machinery, Water system, HVAC system and site supervision.





Actoverco , Iran, Fill & Finish Project.

This is a biotech project which has already being implemented in two phases. Project has lyophilized products and prefilled syringe lines. This is just an upgradation of the existing biotech facility in a new building to cope up with the market demand and also for the introduction of new products into production. Scope was acting as PMC for the project, supply & Installation of Machinery, Water system, HVAC system.


Actoverco, Iran. API project.

This is a API production facility in the form of MABS and Mammalian production unit which has already being implemented. Scope was acting as PMC for the project, supply & Installation of Machinery, Water system, HVAC system.


Alborz Zagros Pharmaceutical Corporation, Iran.

This is a pharmaceutical OSD plant which is under implementation now. The facility is having two production lines. It is an entire contained production facility, producing hazardous pharma products (The products to be prepared will of OEL 5). Scope includes acting as PMC for the project, supply & Installation of Machinery, Water system, HVAC system and site supervision.


Actoverco White Palace, Iran, OSD Project

This project is under implementation now. This is a pharma OSD plant which will be having two production lines. This is just an upgradation of the existing OSD facility in a new site to cope up with the market demand. Scope includes acting as PMC for the project, supply & Installation of Machinery, Water system, HVAC system.


Parsam Rubber Pharmed, Iran, Sterile rubber stopper Project.

This project is under implementation now. This is a sterile rubber stopper production unit. Scope includes supply of Water system (Purified water & WFI), Chiller, Laminar Airflow unit and cleanroom modular partition with installation and site supervision.


Baidyanath Ayurved Pvt. Ltd, Kolkata.This is a Ayurvedic solid dosage unit.

This project is under implementation now. This is an Ayurvedic solid dosage unit which will be implemented into two production lines (tablet & capsule). Scope includes preparation of plant layout as per WHO GMP norms, capacity balancing and selection of machineries, providing all necessary documents as per WHO GMP guidelines, Assisting the client regarding the application procedure of WHO Audit and certification.


Our Revamp Project



La Chemico, India Oral Solid Dosage Project.

This is an ongoing project aimed at revamp of existing pharmaceutical facility to a state of the art production unit as per WHO GMP norms.


Our Validation Projects:



Actoverco, Iran, Oral Solid Dosage Project.

The scope included preparation of the complete validation documents and implementation of the GMP system, working with the local team for implementation of GMP as well as conducting the GMP audit. In addition, we are also involved in handling of third party audits.


Actoverco, Iran, Biotech Phase I Project.

This validation Project successfully completed, Scope of work included Validation of HVAC, Preparation of all Quality Assurance Documentation.


Alborz Zagros Pharmaceutical Corporation, Iran.

This project is under implementation now. Scope include Complete process validation including OEL validation, Computer system validation, complete utility validation including HVAC validation, Validation protocols, preparation of all Quality Assurance Documentation & SOPs.


Dr. ABIDI Pharmaceutical, Iran.

TIn this project is under implementation now. Project involves two production lines (Tablet and Capsule). Scope of work would include complete process & utility validation, Validation protocols, preparation of all Quality Assurance Documentation & SOPs.


 

Nuvista Pharma Limited, Bangladesh, Oral Solid Dosage Project.

This has been successfully implemented. Scope of work included execution of validation tasks for the sterile facility as per cGMP norms as well as provision of accompanying documentation.


Nuvista Pharma Limited, Bangladesh.Sterile Project.

PARSAN has successfully completed validation tasks for the Oral solid dosage facility (Oral contraceptives & steroids) as per cGMP norms including the OEL validation jobs as well as provided all documentation related to validation.


Baidyanath Ayurved (Good Care), India.

TIn this project is under implementation now. Project involves two production lines (Tablet and Capsule). Scope of work would include complete process & utility validation, Validation protocols, preparation of all Quality Assurance Documentation & SOPs.