REVAMP OF FACILITIES

-: Greetings from Parsan Engineers & Consultants :-

REVAMP OF FACILITIES



1. System Evaluation and preparation.

2. Preparation of Working Plan.

3. Gap Analysis.

  • Layouts
  • Air Handling System
  • Utility System

4. Project Definition

  • Starting Situation
  • Project Basis

5. Layout, Material Flow, Personnel Flow, Hygienic Zones

  • Preparation of Fresh Layout drawings
  • Materials Flow
  • Personnel flow
  • Hygienic Zonin
  • Explosion / Hazardous Area

6. Building and HVAC

  • Pharmaceutical Interior Finish
  • Waste water disposal line
  • General Rooms
  • Production Rooms (Hygienic zone)
  • Submission of Revised Design parameters for Room conditions based on which fresh drawings are prepared.

7. Electrical Engineering

  • Checking of the Electrical drawings.

8. Utilities

  • Purified Water / WFI -Finalization of Drawing of Water Distribution Loop.
  • Compressed Air – Drawing of Compressed Air Line.
  • Layout drawing showing Pendant points in the rooms.
  • Pendant drawings showing utility points.
  • Room wise Pendant detail in tabular form.

9. Environmental Protection

  • Effluent Treatment Plant
  • Treatment of Exhaust air
  • We define the steps towards an "integrated plant qualification" at the beginning of new (re)construction.

10. Technical concepts and design in accordance with GMP requirements